
Yantai Tailings Dry Stacking and Dewatering Project
A benchmark for the green transition of traditional mining, this project enables safe, eco-friendly disposal and potential resource recovery of tailings, offering a sustainable solution for coastal mining cities.
01
High-efficiency thickeners, vacuum filters, and high-frequency dewatering screens are used to form a complete tailings dewatering system with stable operation and easy maintenance.
02
A three-stage process of thickening, dewatering, and dry discharge achieves excellent results, reducing tailings moisture content to below 15%.
03
The filtrate is clear and directly recycled back into production, significantly reducing freshwater consumption and wastewater discharge.
04
The thickener, pump station, and dewatering workshop are arranged according to site elevation to utilize gravity flow, reducing energy consumption and pipeline wear.
Yantai Tailings Dry Stacking and Dewatering Project
A benchmark for the green transition of traditional mining, this project enables safe, eco-friendly disposal and potential resource recovery of tailings, offering a sustainable solution for coastal mining cities.




Related Products
Product Features This product is used in the carbon slurry...
Product Features The desorption electrolysis unit is key equipment in...
Product Features - The complete set of desorption-electrolysis system equipment...
Product Features The oscillating feeder is suitable for the mining,...
Product Features The ZSW‑series vibrating feeder is mainly used to...
Product Features The trough feeder is generally suspended at the...
Product Features The GZ series electromagnetic vibrating feeder is used...
Product Features The DZ Series Motor Vibrating Feeder is a...
Product Features The spiral feeder is mainly used for continuous...
Product Features The belt feeder is a relatively short-length belt...












































